Skip to: Navigation | Content | Footer

Puhoi to Wellsford indicative route

Updated: 8 March 2011

Consultation on an indicative route between Puhoi and Warkworth closed on 28 January 2011.

Project objectives

As one of the roads of national significance, the Puhoi to Wellsford project will:

  • Enhance inter-regional and national economic growth and productivity
  • Improve movement of freight and people between Auckland and Northland
  • Improve the connectivity between the medium to long term growth areas in the northern Rodney area
  • Improve the reliability of the transport network through a more robust and safer road between Auckland and Northland.

The indicative route

The indicative route is a result of seven months of in-depth specialist work assessing environmental, social and engineering inputs which includes getting your feedback in consultation phase one. This investigation will continue to occur over the next few months as we develop the indicative route and get comments back from you and your community.

The area shown on the map is described as a 'footprint'. We have used our specialists and engineers to estimate where we will need more land for earthworks (because the ground conditions vary along the route). We have also allowed room for other features required during construction such as stormwater ponds, disposal sites, etc.

Indicative route map

As we are consulting on an indicative footprint, it is important to remember this route may change as we gain a better understanding of the environment and complete further engineering design. We have done the best we can to show this as accurately as possible but please be aware that this may change in the future.

To read more about the project visit: www.nzta.govt.nz/puhoi-wellsford

Public information days

The NZTA team and its specialists will be on-site to answer your questions at the following information days:

  • Saturday 20 November 10-2pm, Warkworth Primary School, Hill Street, Warkworth
  • Tuesday 23 November 4-7.30pm, Old Masonic Hall, Baxter Street, Warkworth
  • Thursday 25 November 3.30-7.30pm, Puhoi Sports Club, Puhoi Domain, Puhoi
  • Sunday 28 November 10-2pm, Warkworth Primary School, Hill Street, Warkworth.

How to make a submission

We welcome your feedback on the indicative route. This could include comments on possible effects on the environment; the effects on your property, that of your neighbours or on your local community; and any other matters you may wish to raise. Your feedback will be taken into account as part of the ongoing development of the route of the new highway and access points.

Please use either the online feedback form or the downloadable version (PDF, 1.5 MB).

Send your comments to us at the following address:

FreePost Authority Number 66927,
Puhoi to Wellsford road of national significance,
PO Box 9806,
Newmarket,
Auckland 1149.

Email puhoi-wellsford@nzta.govt.nz

Call us on 0800 P2W NZTA (0800 729 6982).

Feedback form

Closing date

This consultation closed on Friday 28 January 2011.